Taking expressive cues in tones, texture and form from the collective calm of its revered Burleigh beachfront tenure is Sea, an intimate collection of half-floor and full-floor residences exclusive to 96 The Esplanade.
Sea’s simple and elegant apartment designs embrace, celebrate and maximise a connection with the water while addressing comfort, climate, liveability and utmost privacy of uncompromised quality and superior detail.
An exceptional wellness podium of unrivalled amenity epitomises Sea’s commitment to an elevated level of leisure, lifestyle and luxury to include a pool, sauna, ice baths, gymnasium and pilates studio, bathroom facilities, and an alfresco dining terrace serviced by an integrated barbecue kitchen ensconced by idyllic gardens of cascading greenery and tropical foliage.
Address
96 The Esplanade
Burleigh Heads, Gold Coast
Levels
18
Product Mix
Half-Floor Apartments, Full-Floor Residences, One Dual-Level Penthouse
Architect
Koichi Takada Architects
Interior Designer
Mim Design
Builder
TBA
Construction Timeline
Late 2022 – Late 2024
Website
Taking expressive cues in tones, texture and form from the collective calm of its revered Burleigh beachfront tenure is Sea, an intimate collection of half-floor and full-floor residences exclusive to 96 The Esplanade.
Sea’s simple and elegant apartment designs embrace, celebrate and maximise a connection with the water while addressing comfort, climate, liveability and utmost privacy of uncompromised quality and superior detail.
An exceptional wellness podium of unrivalled amenity epitomises Sea’s commitment to an elevated level of leisure, lifestyle and luxury to include a pool, sauna, ice baths, gymnasium and pilates studio, bathroom facilities, and an alfresco dining terrace serviced by an integrated barbecue kitchen ensconced by idyllic gardens of cascading greenery and tropical foliage.
Address
96 The Esplanade
Burleigh Heads, Gold Coast
Levels
18
Product Mix
Half-Floor Apartments, Full-Floor Residences, One Dual-Level Penthouse
Architect
Koichi Takada Architects
Interior Designer
Mim Design
Builder
TBA
Construction Timeline
Late 2022 – Late 2024
Website
33 DOGGETT STREET,
TENERIFFE QLD 4005